Wastewater and stormwater discharge permits, individual surface and groundwater as well as general permits are included in the system.
The Joint Permit Application is a multi-purpose application used to describe and quantify proposed activities regulated by the DEQ and/or the USACE. Michigan’s Section 404 Program is administered by the Michigan DEQ (formerly part of the Michigan DNR). DEQ has recently released an online system to apply for and manage a range of water permits.

Michigan's Title V program was modeled after the federal program, but DEQ refers to the permit as an ROP.
The Montana Department of Environmental Quality is charged with protecting a clean and healthy environment as guaranteed to our citizens by our State Constitution. Our ultimate goal is to protect public health and to maintain Montana's high quality of life for current and future generations. The permits to install authorize the construction or modification of a nonmajor source, as well as operation of the source. Essential permits and DEQ contacts are listed for the Air, Water, Waste, Tanks, and Renewable Energy programs. DEQ General Permit Guide: Introductory Overview September 21, 2012 Page 1 of 13 DEQ Permitting Guide This guide provides a broad, introductory overview of various Department of Environmental Quality permitting procedures. Various cities work with the Michigan Department of Environmental Quality’s Brownfield Redevelopment Grant Program. administered by the Michigan Department of Environmental Quality (DEQ) and the U.S. Army Corps of Engineers (USACE). You are advised to read the actual General Permit first to determine applicability and if your facility can comply with all the conditions of the permit. Application Filed under Chapter 515 Rules. Draft Permit & Opportunity to Provide Comments or Request a Public Meeting (515 Rules) DEQ ePortal System - Air Permits Branch. This application is for those activities regulated by Michigan issues three types of NPDES permits: individual permits, general permits, and permits-by-rule. ... General Permits need to complete the Notice of Intent (NOI) form and a disclosure form, if necessary. Application Filed under Chapter 517 Rules. The construction or modification of major sources must be done in compliance with nonattainment NSR and/or PSD. The state processes approximately 5,000 – 6,000 permit applications per year through this program, funded in part by permit fees but primarily by state general funds. If the site under consideration is a brownfield (old industrial site or site of environmental contamination), then you may want to consider calling … The tool is called FACTS and stands for Fees, Applications & Compliance Tracking System. DEQ's Water Resources Division administers and enforces the NPDES permit requirements in Michigan. • Administration and enforcement.